Uncategorized
-
Presentation of the kit
-
Module 1 - Fuses and circuit breakers
-
- Join this Course to access resources
-
Module 2 - Sizing a solar kit
-
- Join this Course to access resources
-
Nodule 3 - Installation and wiring of solar kits
-
- Join this Course to access resources
-
Module 4 - Configuration and commissioning of solar systems
-
- Join this Course to access resources
-
Module 5 - Monitoring and optimization of the performance of a solar kit
-
- Join this Course to access resources
-
Module 6 - Maintenance and troubleshooting of energy systems
-
- Join this Course to access resources
-
Final Evaluation for Certification
Module 4 - Quiz
Rating
0
0
There are no comments for now.
Join this Course
to be the first to leave a comment.
1.
What is the correct priority when operating in On-Grid mode?
2.
Which of these elements cannot be configured using VE.Bus Quick Configure?
3.
What is the role of the VEFlash software?
4.
Which of the following functions cannot be performed by VictronConnect?
5.
Which of the following parameters cannot be changed on an inverter?
6.
The GoPower 100Ah battery has three charging phases, which one is incorrect?
7.
What is the correct disconnection order?
8.
What is the default password required to connect to the IMPPT via the VictronConnect app?
9.
What is the maximum charging current that the MPPT 250/100 charge controller can provide to charge batteries?
10.
Which of these functions cannot be performed using the Cerbo GX?